But here are some of the things that got done:
1. More underground rough-in plumbing. Finished the laundry room, kitchen sink/DWs, Guest BA and almost all of the Master BA. Didn't see the new shower connection, so I'll need to check-in with the plumber and make sure he's going to do that Mon am, before the inspection. Also checked where the drain pipes (all plastic) came up into the walls/floor and I'm a bit concerned about the Guest BA locations. Will need to review with plumber.