Another "day off". DH went to the house and opened up the gates. I went to my eye appt. Our neighbor locked up at the end of the day!
But here are some of the things that got done:
1. More underground rough-in plumbing. Finished the laundry room, kitchen sink/DWs, Guest BA and almost all of the Master BA. Didn't see the new shower connection, so I'll need to check-in with the plumber and make sure he's going to do that Mon am, before the inspection. Also checked where the drain pipes (all plastic) came up into the walls/floor and I'm a bit concerned about the Guest BA locations. Will need to review with plumber.
2. Framer came and snapped chalk lines where new walls will go. Checked those against the plan and might make some small tweaks, but overall really happy with the spaces, especially with the laundry/mudroom. Was afraid it was going to be too small, but it looks fine. They also removed some existing walls.
Wow, really feels like a great room!