Louie-HVAC work; borrowed his power drill and connected the bathroom fan ducts to the roof jack opening. Strapped the ducts, taped them with metal foil tape. Crouched on the ceiling joists in order to connect the Master BA fan.
Went up to SF and bought front door and all other interior doors.
Checked out the vacpans.
Plumber installed bathtub.

Starting to have the difficult "money" conversations with the subs.
Cut down the wisteria vine so Ed can come and demo the deck. Before:


Like my new abbreviated, no nonsense style?
Sorry, barely enough time to sleep, brush my teeth, take a shower!
No comments:
Post a Comment